ACC | Adaptive Cruise Control / Adaptive Geschwindikteitsregelungen |
ADAS | Advanced Driver Assistance Systems / Fortschrittliches Fahrerassistenzsystem |
ASIL | Automotive Safety Integrity Level |
ASMS | Arbeitsschutzmanagementsystem |
ASPICE | Automotive Software Process Improvement and Capability Determination |
AUTOSAR | Automotive Open System Architecture |
BCM | Body Control Unit (Zentral Steuergerät) |
CAL | Cybersecurity Assurance Level (Vertrauensstufe der Cybersicherheit) |
CAN | Controller Area Network |
CCB | Change Control Board |
CCPM | Critical Chain Project Management |
CCU | Climate Control Unit / Klimaanlage |
CIRP | Cybersecurity Incident Response Plan (Reaktionsplan für Cybersecurityvorfälle) |
CMMI | Capability Maturity Model Integration |
Components | (Context ISO 26262) The components have higher abstraction level as modules, a component can be constructed form multiple modules. From the integration point of view the components can be easier integrated in to the system as module |
Configuration Management | (ASPICE) Ermöglicht eine Zuordnung von jedem Konfigurationselement (Arbeitsprodukt) zu einer bestimmten Phase des Projekts |
CPU | Central Processing Unit |
CS | Cybersecurity |
CSMS | Cybersecurity Management System |
CVSS | Common Vulnerability Scoring System |
DC | Duty Cycle |
ECU | Electronic Control Unit |
ECU | Engine Control Unit (Motor Steuergerät) |
EDA | Event Driven Architecture / Ereignisgesteuerte Architektur |
EMV | elektromagnetische Verträglichkeit |
EPB | Electronic Parking Brake / Elektronische Parkbremse |
ESC | Stability Control Unit / Stabilitätskontrollsteuergerät |
ESW | Embedded Software (verwendet oft in Kontext von ISO 26262) |
FFI | Freedom From Interference |
FMEA | Failure Mode and Effect Analysis |
FMS_PCB | Fenstermotorsteuerung Platine (Subsystem) |
FS | Functional Safety (Funktionale Sicherheit) |
FSC | Functional Safety Concept (Funktionales Sicherheitskonzept) |
FSR | Functional Safety Requirements (Funktionale Sicherheitsanforderungen) |
FTA | Failure Tree Analysis |
FTTI | Fault Tolerant Time Interval |
H_PCB | Fenstersteuergerät Hauptplatine (Subsystem) |
HARA | Hazard and Risk Analysis (Gefahr- und Riskanalyse) |
HIL | Hardware-in-the-loop |
HR | Human Ressources |
HSI | Hardware Software Interface / Hardware-Software-Schnittstelle |
HW | Hardware |
ICU | Infotainment Control Unit / Infotainment-Steuergerät |
IEC | International Electrotechnical Commission |
INCOSE | International Council on Systems Engineering |
ISMS | Informationssicherheits-Managementsystem |
ISO | International Organization for Standardization |
KL15 | Termnal 15 – Ignition (Klemme 15 – Zündung) |
KPI | Key Performance Indicator |
LCM | Lighting Control Module / Lichtkontrollsteuergerät |
LKA | Line Keeping Assist / Spurhalteassistent |
LoC | Lines of Code |
MBSE | Model Based Systems Engineering |
ME | Mechanik (Disziplin des Systemengineerings) |
MISRA C | Motor Industry Software Reliability Association |
MPU | Memory Protection Unit |
OEM | Original Equipment Manufacturer |
PAM | Process Accessment Model |
PCU | Power Control Unit / Antriebsstrangsteuerung |
PDCA | Plan-Do-Check-Act |
PLC | Product Life Cycle |
PM | Projektmanagement / Projektmanager (abhängig vom Kontext) |
PRINCE2 | PRojects IN Controlled Environments |
PRM | Process Reference Model |
QM | Qualitätmanagement |
QMS | Qualitätsmanagementsystem |
QUA | Quality Department / Qualitätsabteilung |
RAM | Random Access Memory |
ROM | Read Only Memory |
SAE | Society of Automotive Engineer |
SCU | Steering Control Unit / Lenksteuergerät |
SDLC | Software Development Lify Cycle |
SIG | Special Interest Group |
SIL | Software-in-the-loop |
SOA | Service Oriented Architecture / Serviceorientierte Architektur |
Software Element | (Context ISO 26262) “Software Element” refers to a discrete unit or component within the software architecture of a safety-critical system which have specific function. This could be a function or function group. Example: functions, modules |
Software Module | (Context ISO 26262) The modules can be represented as files or folders with specific functionalities. It shall be decided in project how the modules can be represented. |
SOP | Start of Production (Produktionsstart) |
SOTIF | Safety of the intended functionality |
Stakeholder | Im Kontext vom agilen Projektmanagement führende Rollen wie Abteilungsleiter, Senior-Manager, externe Partner |
SUMS | Software Update Management System |
SW | Software |
SWA | Software Architektur |
SWC | Software Component (Software Komponente) |
SWIT | Software Integration Test (Software Integrationstest) |
SWU | Software Unit (Software Einheit) |
SWUD | Software Unit Design (Software Einheit Design) |
SWUT | Software Unit Test (Software Einheit Test) |
SYS | System |
SysML | Systems Modeling Language |
TARA | Threat Analysis and Risk Assessment (Bedrohungsanalyse und Risikobewertung) |
TCL | Tool Confidence Level |
TCU | Transmission Control Unit (Getriebesteuergerät) |
TSC | Technical Safety Concept (Technische Sicherheitsanforderungen) |
TSR | Technical Safety Requirements (Technische Sicherheitsanforderungen) |
UDS | Unified Diagnostic Services |
UMS | Umweltmanagementsystem |
VDA | Verband der Automobilindustrie |